PSK-käsikirja 2 - Instrument installation

Price: 270/550 (Liitteineen) €, free to members

Handbook comprises standards PSK 5201 to 5210 concerning instrument installation hook-up drawings. When compiling the standards we have not pursued to establish new installation techniques, instead we have standardized solutions that have been most common and deemed good in practice. A sound price/quality relation has been one criterion. The mode of presentation is a simplified, axonometric assembly drawing whenever possible and applicable. The selected mode of presentation has been the most widely used, so it is deemed to be the most suitable for this purpose, as these drawings can be interpreted without any language skills. A deliberate decision was not to make the standards strictly binding, as installation techniques vary in different lines of industry. The purpose of the standards is to serve as a basis for preparing installation documentation that would ensure the best possible results specific to a project or line of industry. The number of installation hook-up drawings has been limited to a minimum to keep them easy to find.
The presented installation method does not take a stand on where the measurement has been located or to which position the process pipe has been installed. The location of measurements in the process is presented in the standard SFS 5059, Instrumentation. Location of process instruments. Structures related to splash guarding, insulation or similar features are not defined in the installation hook-up drawings contained in the manual, these specifications have been left out for installation cost reasons wherever they are not absolutely necessary. These issues need to be observed as required by circumstances and shall be specified in purchase documentation. The presentation of isolator switches installed in the main actuator circuit, required for preventing accidental start-up, and interlocking switches installed in the control circuit, preventing accidental start-up, is deemed to belong to electrification instructions, so they are not presented in installation hook-up drawings. Delivery limits for all parts and items of equipment have been defined in compliance with the standard PSK 3301, Instrumentation. Share of the responsibility for design, purchase and installation, in order to ensure that the responsibility for purchases and installation be unambiguously determined. The limits of responsibility must be checked to comply with purchase and installation circumstances.

Info

Standard code
PSK-käsikirja 2
Standard name
Instrument installation
Edition
2nd edition
Published
8.1.2003
Corrected
-
Technical group
52 Instrumentation
Language
Finnish/English
Pages including appendixes
410
Other
includes the 52 group standards and hook-up drawings in electronic format (dwg, dxf, pdf)

Keywords

assembly drawing field Installation instrument Instrumentation mode Type

Development ideas?

Oletko lyötänyt standardista puutteen tai virheen? Lähetä meille huomiosi yhteydenlomakkeella, niin työryhmämme voi kehittää standardia entistäkin paremmaksi.

Join the activity?

Jos olet kiinnostunut kehittämään standardointia osana työryhmää, ota yhteyttä:

Jukka Koistinen Executive director