PSK 5210 - Instrumentation hook-up drawings. Cables.
Price: 108 €, free to members
In the appendices AW01 – AW05, AW11, AW12, AW21, AW22, AW31, AW32 and AW50 - AW54 of this standard there are presented hook-up drawings with associated part lists for the following instrument installations:
AW01 Signal cable, 2-pair
AW02 Signal cable, 4-pair
AW03 Signal cable, 8-pair
AW04 Signal cable, 12-pair
AW05 Signal cable, 24-pair
AW11 Power cable, 3x1,5S
AW12 Power cable, 3x2,5S
AW21 Pneumatic cable, 2x6/4
AW22 Pneumatic cable, 2x10/7
AW31 Electro-pneumatic cable, 2x6/4+2x(2+1)
AW32 Electro-pneumatic cable, 2x10/7+2x(2+1)
AW50 Field bus, general view
AW51 Double field bus
AW52 Field bus, T-connector
AW53 Field bus, equipment connection
AW54 Field bus, multi barrier, copper
Info
- Standard code
- PSK 5210
- Standard name
- Instrumentation hook-up drawings. Cables.
- Edition
- 1st edition
- Published
- 23.6.2003
- Corrected
- -
- Technical group
- 52 Instrumentation
- Work groups
- PSK 52/1 Instrument hook-up drawings
- Language
- Finnish/English
- Pages including appendixes
- 22
- Other
- -
Keywords
assembly Cable drawing field Installation instrument Instrumentation mode Type
Development ideas?
Oletko lyötänyt standardista puutteen tai virheen? Lähetä meille huomiosi yhteydenlomakkeella, niin työryhmämme voi kehittää standardia entistäkin paremmaksi.
Join the activity?
Jos olet kiinnostunut kehittämään standardointia osana työryhmää, ota yhteyttä: