PSK 5210 - Instrumentation hook-up drawings. Cables.

Price: 108 €, free to members

In the appendices AW01 – AW05, AW11, AW12, AW21, AW22, AW31, AW32 and AW50 - AW54 of this standard there are presented hook-up drawings with associated part lists for the following instrument installations:
AW01 Signal cable, 2-pair
AW02 Signal cable, 4-pair
AW03 Signal cable, 8-pair
AW04 Signal cable, 12-pair
AW05 Signal cable, 24-pair
AW11 Power cable, 3x1,5S
AW12 Power cable, 3x2,5S
AW21 Pneumatic cable, 2x6/4
AW22 Pneumatic cable, 2x10/7
AW31 Electro-pneumatic cable, 2x6/4+2x(2+1)
AW32 Electro-pneumatic cable, 2x10/7+2x(2+1)
AW50 Field bus, general view
AW51 Double field bus
AW52 Field bus, T-connector
AW53 Field bus, equipment connection
AW54 Field bus, multi barrier, copper

Info

Standard code
PSK 5210
Standard name
Instrumentation hook-up drawings. Cables.
Edition
1st edition
Published
23.6.2003
Corrected
-
Technical group
52 Instrumentation
Language
Finnish/English
Pages including appendixes
22
Other
-

Keywords

assembly Cable drawing field Installation instrument Instrumentation mode Type

Development ideas?

Oletko lyötänyt standardista puutteen tai virheen? Lähetä meille huomiosi yhteydenlomakkeella, niin työryhmämme voi kehittää standardia entistäkin paremmaksi.

Join the activity?

Jos olet kiinnostunut kehittämään standardointia osana työryhmää, ota yhteyttä:

Jukka Koistinen Executive director